← ALL PROJECTS

INFRASTRUCTURE · 2023 · 84 M SPAN

Northgate Footbridge

Tied-arch pedestrian bridge lifted into place overnight across a live rail corridor.

White steel truss footbridge spanning calm water

CLIENT

City Rail Partnership

LOCATION

Leeds, UK

TYPE

INFRASTRUCTURE · 2023 · 84 M SPAN

OVERVIEW

An 84 metre tied-arch footbridge connecting two neighbourhoods across a live rail corridor.

The span was assembled off-site and lifted into place overnight to avoid closing the line.

Everything you see standing was once only an idea.
Someone had to engineer it.

HAVE A PROJECT
THAT NEEDS TO STAND?

Tell us about the site, the programme and the ambition. A chartered engineer replies within two working days.

  • AVAILABLE FOR NEW PROJECTS

  • ✦

  • 2027 BOOKINGS OPEN

  • ✦

  • TOWERS · BRIDGES · PUBLIC BUILDINGS

  • ✦

  • REPLY WITHIN 48 HOURS

  • ✦

BUILT FOR
WHAT COMES NEXT.

Have a site in mind? Book a 30-minute intro call with a chartered engineer and get a first structural opinion.

START A PROJECT →

2 PROJECT SLOTS OPEN

THE STRUCTURE NOTES

Quarterly notes on structure, materials and site lessons. No spam.

One email a quarter. Unsubscribe anytime.

ACCREDITED

ISO 9001

ISO 14001

ISO 45001

CHARTERED ENGINEERS

BIM LEVEL 2

NET-ZERO PLEDGE

ENGINEERING STUDIO

© 2026 ENGINEERING STUDIO — ALL RIGHTS RESERVED

STRUCTURE · PRECISION · ENDURANCE

BACK TO TOP

↑

Create a free website with Framer, the website builder loved by startups, designers and agencies.