INFRASTRUCTURE · 2023 · 84 M SPAN
Northgate Footbridge
Tied-arch pedestrian bridge lifted into place overnight across a live rail corridor.

CLIENT
City Rail Partnership
LOCATION
Leeds, UK
TYPE
INFRASTRUCTURE · 2023 · 84 M SPAN
OVERVIEW
An 84 metre tied-arch footbridge connecting two neighbourhoods across a live rail corridor.
The span was assembled off-site and lifted into place overnight to avoid closing the line.
Everything you see standing was once only an idea.
Someone had to engineer it.